Skip to content

Electrical Safety Testing & Compliance for Ships and Offshore Platforms

Precision testing. Full documentation. Class-compliant results.

Introduction

Electrical failures are among the most dangerous and costly incidents aboard marine vessels.
Whether caused by insulation breakdown or faulty protection systems, the results can be catastrophic – from equipment damage to life-threatening fires.

That’s why Delta Marine Sweden provides comprehensive marine electrical safety testing and compliance services – helping you meet class requirements, ensure operational integrity, and protect crew and assets.

Service Overview: What We Test

Our certified electricians and measurement engineers perform two primary categories of tests:

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Insulation Resistance Testing (Megatest)

Also known as a “megatest”, insulation resistance testing evaluates the dielectric quality of cables, motors, and generators.
We measure:

We test using:

  • 500V to 5kV test voltages (depending on system rating)
  • Class-approved, calibrated equipment
  • Under isolated or operational conditions

Benefits:

  • Early detection of aging insulation
  • Fire prevention and system stability
  • Class compliance (SOLAS, DNV, IEC 60092)
Each test comes with a detailed report, system map, and failure risk evaluation.

Short-Circuit Protection Testing

We measure the condition and functionality of short-circuit protection devices in:

We evaluate:

  • Tripping times and current thresholds
  • Fault loop impedance
  • Earth continuity
  • Selectivity and coordination of protection devices
    Why it matters:

If your fuses or breakers don’t trigger fast enough – or at all – your vessel is at serious risk.
Our testing ensures critical disconnection happens before damage or fire occurs.

Supported Systems and Voltages

We test and verify:

  • Low-voltage systems (230V–1000V AC/DC)
  • High-voltage marine systems (3.3kV, 6.6kV, 11kV)
  • Single- and three-phase installations
  • Motors from 1kW to 2MW
  • Generator protection systems
  • Integrated propulsion and hybrid grids

We also test after:

  • New system installation
  • Generator or UPS swap
  • Fire or overload event

Classification renewal inspection

Measurement Methods & Standards

All tests are performed using:

Deliverables & Documentation

For every job, you receive:

  • Full measurement protocol
  • Resistance tables with cable ID and location
  • Disconnection time reports
  • Grounding and loop impedance logs
  • One-line schematic with tested zones marked
  • Class submission report (PDF)

This documentation supports:

  • Ship inspections
  • Internal technical records
  • Insurance and classification audits

Predictive maintenance programs

Where We Work

Delta Marine provides mobile testing across:

We work with:

  • Shipyards and builders
  • Offshore engineering companies
  • Shipowners and operators
  • Government and defense fleets
  • EPC contractors and classification surveyors

     

Why Clients Trust Delta Marine

  • ✅ Decades of marine electrical testing experience

  • ✅ Certified electricians trained in HV & LV systems

  • ✅ 24–72h testing availability (mobile team)

  • ✅ All tools calibrated and traceable

  • ✅ Documentation accepted by DNV, BV, RINA, ABS

We combine technical accuracy with real-world reliability, keeping your ship ready, safe, and compliant.

Example Project

We provide full-scope solutions tailored for the maritime environment:

Real-World Case Study: Gdynia Shipyard 2023

A newbuild offshore supply vessel required full system compliance testing prior to delivery.

Delta Marine:

  • Tested over 150 LV and HV cable circuits
  • Performed megatest on 2 x 900 kW propulsion motors
  • Verified selectivity in generator protection (4-panel system)
  • Delivered full documentation in under 48 hours

Class inspection passed on first submission, saving the shipyard time and penalties.

FAQ

Typically 1 MΩ per kV is considered the minimum. For 1kV, that’s 1 MΩ. For HV, you want ≥5 MΩ or more.

For commercial vessels, we recommend annually. For high-voltage systems, every 6–12 months.

Yes – many of our tests are non-disruptive and can be performed during regular port calls or dock time.

Yes – we can advise on repairs, rewiring, and component replacement. We also support retrofit upgrades.

Let’s Make Your Vessel Electrically Safe

Let’s reduce risk, meet compliance, and extend system life – with precise, documented electrical safety testing.
We make sure your power stays safe, stable, and certified.

Contact Delta Marine Sweden to schedule testing or request a quote.

Service

Ask for the service

Marine Electrical Safety Testing & Compliance | Delta Marine Sweden

Recruitment form

If you want to work in our company, write to us via the form below

or call +46 723 663 926

Free quote

Describe the order that you want us to perform for you